Leap frogging in Spring

Posted by Ian Everett on Wednesday Apr 29, 2015 Under Uncategorized

What an interesting April, we have been leap frogging from one event to another from an Exhibition for Hewlett Packard with adjustable furniture in a 5 star hotel in Heathrow to a cleaver use of uniform size backdrops for another exhibition for Domino’s Pizza in Birmingham and a Conference and awards event for Londis with DMSAV in ExCeL London. We also put together the Health and Safety documentation to submit to each venue for all 3 events. Maybe there is a turn around in the economy, we have had to turn away 4 projects over this time period due to our existing commitments. It is such a shame the work can not be spaced out across the year, the Spring is still a peak point in the events calendar.

ExCeL London Conference and Awards event

ExCeL London Conference and Awards event

Exhibition build at the ICC

Double sided expo backdrops to help with delegate flow

IMG_3063

Use of adjustable height furniture and slat wall for displaying accessories

Comments are closed.